This mobile plant introduction checklist helps construction teams verify documentation and safety readiness before bringing equipment on site. It covers prestart documents like manuals, maintenance records, registration, PRA and SWMS, cabin access and egress, warning devices and labels, plant specific requirements for load shifting and earthmoving, engine and hydraulics checks, crane specific verifications, and operational tests by a competent operator. Include photos, notes, actions, and digital signatures.
With Mitti you can
With Mitti you can
About author
Mitti (by SafetyCulture) is the operations system for every site, shift and standard. Trusted by 80,000 organizations in 190 countries, Mitti publishes free checklists, SOP templates, audit checklists and toolbox talk topics that turn paper processes into a digital audit trail. Download one, put it to work on your next inspection or shift, and see why teams keep coming back for more.