Skip to content
Mitti by SafetyCulture
Template

Civils Risk Assessment and Method Statement RAMS

Downloads: 20+
Get this template

Use this civil engineering risk assessment and method statement template to plan and control street works and duct repairs for fibre installations. It covers scope of works, affected persons, hazard identification and controls, PPE specifications, plant and equipment, permits, underground service locating with CAT and Genny, gas monitoring in chambers, traffic management to Chapter 8 and the Red Book, dust control, diamond drilling competence, documentation, and sign off. The sequence guides pre start checks, toolbox briefings, ongoing risk review, and site reinstatement. Capture photos for pre site set up and gas detector status, record COSHH details, and log emergency arrangements and first aid information.

With Mitti you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With Mitti you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the Mitti (by SafetyCulture) community. Mitti has re-published this content and where possible, has credited the original author. Mitti has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with Mitti’s Terms and Conditions .