This practical checklist guides teams through safely disconnecting existing site services prior to construction or demolition works. Verify approved construction drawings, identify all services, and set notifications for service disruptions. Cover potable and hot water, gas, drainage and trade waste, stormwater, and fire systems. Ensure live pipework is protected and marked, remove redundant lines, and cap in-ground drainage at appropriate points. Capture verification details, approvals, signatures, and dates for a complete audit trail before works commence.
With Mitti you can
With Mitti you can
About author
This community page makes available free workplace checklists and templates created by other users within the Mitti (by SafetyCulture) community. Mitti has re-published this content and where possible, has credited the original author. Mitti has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with Mitti’s Terms and Conditions .