Skip to content
Mitti by SafetyCulture
Template

Method Statement and Risk Assessment Evaluation Sheet

Downloads: 0
Get this template

Use this comprehensive method statement and risk assessment evaluation sheet to review RAMS before work begins. Assess description of works, risks from loading and unloading, safeguards for third parties and the public, safe access and egress, and work locations. Confirm COSHH controls and required PPE and RPE, manual handling, noise, and vibration assessments. Check permit to work and lifting plan requirements, asbestos protections, and temporary works design. Verify supervisor competency, valid certifications, and plant and equipment schedules. Document minimum PPE and RPE, emergency and first aid procedures, response plans, induction into RAMS, travel and site access, illness reporting, welfare and hygiene, PPE disposal, planning to avoid close contact, use of lifts and hoists, tools and plant, and site meetings.

With Mitti you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With Mitti you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the Mitti (by SafetyCulture) community. Mitti has re-published this content and where possible, has credited the original author. Mitti has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with Mitti’s Terms and Conditions .