Skip to content
Mitti by SafetyCulture
Template

Specific Risk Register Template

Downloads: 0
Get this template

Use this Specific Risk Register template to log project-specific hazards, controls, permits, and responsibilities on construction sites. Capture risks such as working at heights, asbestos, fragile decks and ceilings, live services, fire risks, site access and parking, occupied areas, vibrations, neighboring properties, and security. Record scaffold design needs, hot works and permits, and Temporary Works Coordinator reviews. Support pre-construction inspections and contingency planning for site levels and structural considerations.

With Mitti you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With Mitti you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the Mitti (by SafetyCulture) community. Mitti has re-published this content and where possible, has credited the original author. Mitti has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with Mitti’s Terms and Conditions .