This checklist helps construction teams plan and manage the temporary shutdown or mothballing of sites. It covers notifications to insurers, updates to risk assessments, emergency response and recommencement plans, and site security. Guidance includes housekeeping, removal of waste and combustibles, isolation of non essential utilities, and maintaining alarms. It addresses plant and machinery storage, crane safety, statutory inspections, and de energizing installed equipment. Steps to prevent water damage, manage earthworks and drainage, and maintain temporary works are included. Use it to document actions, schedule inspections, and ensure a safe restart.
With Mitti you can
With Mitti you can
About author
Mitti (by SafetyCulture) is the operations system for every site, shift and standard. Trusted by 80,000 organizations in 190 countries, Mitti publishes free checklists, SOP templates, audit checklists and toolbox talk topics that turn paper processes into a digital audit trail. Download one, put it to work on your next inspection or shift, and see why teams keep coming back for more.