Use this template to inspect a tower crane before, during and after work shifts. Begin by conducting pre-operation checks by recording work permits issued, evaluate operator's competency and check emergency controls. Next, inspect the components of the crane by capturing photo defects and observe if safety measures were applied. Lastly, assess the post job operation to ensure that the crane is safely unattended. Provide final recommendations during end of shift to improve crane safety.
With Mitti you can
With Mitti you can
About author
Mitti (by SafetyCulture) is the operations system for every site, shift and standard. Trusted by 80,000 organizations in 190 countries, Mitti publishes free checklists, SOP templates, audit checklists and toolbox talk topics that turn paper processes into a digital audit trail. Download one, put it to work on your next inspection or shift, and see why teams keep coming back for more.