Use this Aviva Loss Prevention Standards checklist to manage the risks of high voltage batteries across your site. It guides teams through governance and training, fire and DSEAR risk assessments, safe storage and segregation, OEM-based maintenance, and periodic inspections, including thermographic checks. Verify charging area design, water and contaminant protection, battery management systems, and ventilation interlocks. Confirm fire protection measures such as sprinklers, detection, and local extinguishing systems, and ensure appropriate portable extinguishers and staff training. Establish emergency response and evacuation procedures, isolation of charging and discharging circuits, and post-incident stabilization. Include compliant disposal processes and secure storage for damaged units, with records of inspections and corrective actions.
With Mitti you can
With Mitti you can
About author
Mitti (by SafetyCulture) is the operations system for every site, shift and standard. Trusted by 80,000 organizations in 190 countries, Mitti publishes free checklists, SOP templates, audit checklists and toolbox talk topics that turn paper processes into a digital audit trail. Download one, put it to work on your next inspection or shift, and see why teams keep coming back for more.