Use this Aviva Loss Prevention Standards checklist to manage the risks of high voltage batteries across your site. It guides teams through governance and training, fire and DSEAR risk assessments, safe storage and segregation, OEM-based maintenance, and periodic inspections, including thermographic checks. Verify charging area design, water and contaminant protection, battery management systems, and ventilation interlocks. Confirm fire protection measures such as sprinklers, detection, and local extinguishing systems, and ensure appropriate portable extinguishers and staff training. Establish emergency response and evacuation procedures, isolation of charging and discharging circuits, and post-incident stabilization. Include compliant disposal processes and secure storage for damaged units, with records of inspections and corrective actions.
With Mitti you can
With Mitti you can
About author
Mitti (by SafetyCulture) is the operations system for every site, shift and standard. Trusted by over 80,000 organisations, Mitti brings your people, operational data and workflows into one operating picture. From the frontline to the boardroom, it gives everyone a clear understanding of what's happening, highlights what needs attention and recommends what to do next. Every inspection completed, issue raised and action taken becomes intelligence your teams can use to improve every day.