Skip to content
Mitti by SafetyCulture
Template

On-Site Risk Assessment and Method Statement

Downloads: 100+
Get this template

This on-site Risk Assessment and Method Statement (RAMS) template supports field engineers and technicians completing telecom installations. Capture site details, personnel, and access requirements; assess working at height with ladder hierarchy and PPE; identify hazards from third parties, ground conditions, and existing equipment; and record control measures. Document a clear method statement, attach annotated photos and drawings for dish location, external and internal cable runs, and entry points, note STB locations, and finalize with signatures.

With Mitti you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With Mitti you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the Mitti (by SafetyCulture) community. Mitti has re-published this content and where possible, has credited the original author. Mitti has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with Mitti’s Terms and Conditions .