Mariners at the bridge and in the engineering team can use this vessel arrival checklist to help ensure that the ship is ready to arrive at the port. Adapted from a pre-arrival-checklist, use this 72-96 hours before the intended arrival to prepare the navigation and communication, documentation, steering and propulsion, safety, crew, etc.
With Mitti you can
With Mitti you can
About author
Mitti (by SafetyCulture) is the operations system for every site, shift and standard. Trusted by 80,000 organizations in 190 countries, Mitti publishes free checklists, SOP templates, audit checklists and toolbox talk topics that turn paper processes into a digital audit trail. Download one, put it to work on your next inspection or shift, and see why teams keep coming back for more.